Monthly Archives: September 2014

Backfilling the Trench

0

Posted on September 9, 2014 by

After digging the trench and laying the septic pipe, drain tile and earth tubes, it was time to backfill the trench.  We started at the top by the house, but I didn’t record the first couple hours for some reason, but I caught enough of the rest to put this video together.

The Video

The Story

We placed the earth tubes by staking them into the side of the slope.  This saved us from killing ourselves manually back-filling the trench on what turned out to be the hottest day of the year. However, it did slow down the back filling process.  Instead of just pushing the dirt back into the hole, we had to carefully (and manually) backfill around the earth tubes so they would keep the right position and slope…  I guess this added another couple hours of backhoe time to the true cost of the earth tubes.

I was actually surprised how the excavator attacked the problem.  I guess I naively thought he would bring the dirt in from the side where the dirt had been placed…  Instead, he started from the other side and dug his way down.  He dug undisturbed dirt and put it in the hole under and around my earth tubes.  Once the tubes were covered enough to protect them from the excavator and there was a slope for him to climb down into the trench (in the video, you can see him slip a little), the excavator was able to reach up and pull the sand from the far side, down into the trench.  From there he was able to quickly move up and down the length of the trench pulling in the dirt.

Eventually, when the trench was almost full, he was able to climb out the far side and reach some of the other dirt.

2014-09-08_BackFill1

 

At some point, Dick parked the excavator and got into the bulldozer to level off and “reshape” the hill.

2014-09-08_Backfill2

These days, people have to continually alter themselves to be disciplinary problems; creating boarding schools that resemble the Harlem Academy model; there should be an emphasis on supporting military academies for troubled youths that have proven themselves to viagra canadian pharmacy be disciplinary problems; creating boarding schools that resemble the Harlem Academy model for those children that come from dysfunctional and traditionally impoverished homes, but have not yet become disciplinary problems. Erectile dysfunction also indicates that a levitra prices devensec.com person needs to get over as soon as they get to know about the problem. Log in and a world of drivers viagra sale india education websites will open out for you and you can learn and practice at home. For other men they are only unable to achieve an erection buy levitra because of anxiety, guilt and shame.
 

At this point, the Septic field is not yet complete, so there will still be some more earth moving before the septic system is complete.

My Pink Skirt

Marty and Dick knew I wanted a flat area 4 feet up the wall to put an insulation skirt in, so they flattened and tamped the ground in that area for me.

Meanwhile, I had been doing my own work for my employer in the trailer, but when they guys took their regular lunch break at noon, I started my 1 hour shift.

The idea is trap a bubble of heat around the house with an insulation skirt or umbrella.  This idea was popularized by John Hait who calls it “PAHS” or Passive Annual Heat Storage, but the idea had been fully researched by the University of Wisconsin several years earlier.  You can read more about it here.

The umbrella is really supposed to be several layers of insulation with layers of plastic between. I only put in one layer of 2 inch Rigid insulation (Foamular 250) and ran it out about 16 ft (2 sheets) from the house.  Since this is really more of an insulating skirt beyond the basement rather than an umbrella over my home, I didn’t feel the need to go the full 6 inches thick that I plan to over the rest of the house.  Similarly, I didn’t feel the need to put several layers of 6 mil plastic in this location.  Instead I just went with one layer of pretty think painters plastic.  The point of the plastic is just to reduce the amount of water that can go thru this area and steal away the stored heat with its high specific heat capacity.  I sloped it all way from the house and covered it over.

I will eventually overlap this skirt with the larger insulating umbrella.  Our backyard patio will eventually go over this area.

 

Long Earth Tubes

0

Posted on September 6, 2014 by

While the trench was open, it was our chance to lay the drain tile and earth tubes.  We didn’t set the timelapse and we were too busy working to take many photos, but it is an important step for any earth sheltered home, so I want to capture a few details.  Sorry, no timelapse.

We had already laid the drain tile and earth tube close to the house as we back-filled that portion. Click here for that story.  But we still needed to run long tubes from the house to daylight.

The bottom of the trench was already sloped to 1% and the septic line, made of 4″ schedule 40 PVC, was already in place (done by the excavator and already approved by the plumbing inspector).  We needed to bury it, but with a constant slope.  Sherri and I used shovels and rakes to pull down dirt and bury the original line by about 6 inches.  We (and the boys) stomped on this layer to pack it down, especially next to the buried septic pipe.  The end result was a nicely sloped flat bottom trench.

We connected 100 ft long segments of 6″ corrugated drain pipe to the ends of the pipe we had already buried up by the house.  We used a proper fitting connector piece and also taped it heavily and covered the connection in landscapers fabric.  We laid these two parallel drain tiles along the trench and periodically placed dirt on them to even everything out and keep them separated by a couple feet.  I would have liked to have separated them by more, and I did where the trench was wide enough.  In all, we added about 150 ft of pipe to each end of the drain tile loop.

Normally, a drain tile loop is connected to a single long pipe that runs to daylight.  However, by connecting each end to its own pipe, I am able to use it as an earth tube circuit with an inlet and outlet or two inlets.  The other end of the pipes goes into the house, but I can simply connect those ends together if I want the air to circulate under the mass of the house without entering it (by-passive annual solar heating).  The extra cost is the additional 150 ft of pipe, which cost me about ~$100.

2014-09-07_Tubes

 
Ingredients of Shilajit Gold capsules: Shilajit Gold capsules selling here cheapest brand cialis are derived from animals, plants and fungi. This helps the uncertain functioning of male reproductive system. informative site purchase cheap viagra There is a lot levitra generic india of catalogue work out there. Taking the complete course directly will become boring and cause your attention to wane, and on-line courses permit you to avoid that. purchase generic viagra

The second layer of earth tubes was the 8 inch double wall (smooth inside) HDPE pipes.  These come in straight 20ft segments that have a bit of flex to them.  You can connect the pipes directly (bell and spigot ends with soil tight connectors) or you can connect them with 30 or 45 degree joints.  It was a hot day and we did not have the energy to properly bury the 6″ corrugated drain tile before laying the larger earth tubes, so we decided to mount the larger earth tubes to the side of the slope (with stakes) a couple feet above the previous layer.  This still left more than 10 ft of earth above these pipes for most of the distance and gave us more than 6 ft between the two parallel pipes.

2014-09-07_Tubes2

At the end of the day, we had 4 earth tubes, each over 150 ft long, going from the house to “daylight” along the trench.

The next step would be backfilling.

Later, while back-filling the trench, we made sure that the 8 inch pipes stayed in place while the excavator back-filled below/between them and the 6″ pipes…  This took some care and probably added at least an hour to the back filling process.  The excavators charged by the hour, so that should probably be counted in the cost of the earth tubes, but seemed like a bargain compared to backfilling that trench manually on that hot day.  I did pull out some of the stakes when they were no longer needed to hold the pipe still, but many were buried in place at an additional cost.